Hydropower production in Indonesia is the main renewable energy source in the country. There is a potential to double the capacity by building new hydropower plants and to optimize current plants. PLN is the main hydropower company in the country. The project aims at enhancing the capacity of its staff by developing an eLearning package on hydrology and climate change in the context of hydropower.

Indonesia is endowed with a full range of both renewable and fossil resources of energy, actively exploited to feed its growing economy. Emphasis has been on fossil, hydroelectric and geothermal resources rather than wind and solar. PLN (Perusahaan Listrik Negara) is the Indonesian State Electricity Company. It is an Indonesian government-owned corporation which has a monopoly on electricity distribution in Indonesia and generates the majority of the country’s electrical power, producing about 175 TWh annually. Only a small fraction of this originates from hydropower.

Indonesia has five large hydropower plants with a capacity over 250 MW: Cirata on Java (1008 MW), Saguling on Java (701 MW), Tangga on Sumatra (317 MW), Sigura-gura on Sumatra (286 MW), and Pamona on Sulawesi (260 MW). The Indonesian government aims to develop more hydropower with quite a strong focus on small and micro hydropower plants.

Capacity of PLN staff to understand the hydrology related to hydropower electricity generation needs to be enhanced. Also, the knowledge of the potential impact of climate change on hydropower requires additional capacity of PLN’s staff. Especially their ability to understand and judge feasibility studies undertaken by external consultants requires upgrading their level of knowledge. Also staffs’ capacity to understand climate risk assessment studies, as today required by most investors, should be further developed.

FutureWater was asked to develop and provide training on those two aspects (hydrology and climate change). Given the huge area of the country and PLN staff working in large distances from each other, it was decided to provide training in a eLearning setting. Initially about 25 staff will be trained and based on lessons learnt the training package will be adjusted to staff needs and further training will be undertaken.